Construction

Construction refers to the process of building or assembling structures, infrastructure, or facilities, typically involving the use of materials, equipment, and skilled labor. It encompasses various activities such as site preparation, foundation work, erection of structural components, and finishing touches. Construction projects can range from residential buildings and commercial complexes to roads, bridges, and other civil engineering works. The goal of construction is to create functional, safe, and aesthetically pleasing structures to meet specific needs.
Residential Construction
Commercial Construction
Industrial Construction
CONSTRUCTION AGREEMENT FOR GREY STRUCTURE

NATIONAL WELFARE FOUNDATION

AS PER INTERNATIONAL ENGINEERING STANDARDS

Material/Service

Concrete premix or ready mix (Batching plant)
Sand (only Chenab)
Shuttering (steel)
Bricks (first class Niazi/313 marka)
Crush (Sargodha super quality--plant)
Chokhat (16 Gauge Galvanized Iron)
Cement (Best way, Maple leaf and D.G)
Steel-G60 (Mughal, Amreli, FF, Moiz, Model)
PPRC and PVC pipe (Popular, Turk Plast, Dura, Atlas.)
Brickwork mortar ratio under DPC 1:6
Ratio of cement, sand and crush in DPC, floor PCC, lintel level beam, shade and slabs is 1:2:4.
DPC thickness is 3".
Brickwork mortar ratio above DPC in 9" thick wall is 1:5.
Ratio of cement and sand in plaster is 1:4.
3mm membrane is used for DPC water proofing.
Brickwork mortar ratio above DPC in 4.5" thick wall is 1:4.
Earth filling (pure gas)
Termite Proofing with best quality... Mirage, Jaffer,
Mixing of mortar / Concrete is only mixed by mixer machine.
Main gate and grilles not include in grey structure.
Bridge Structural Design
All work will be done under the supervision of professional engineer.
All parapets wall will be max. 2.5' only in brick work otherwise concrete work will be charged with understandings.
Roof treatment (bitumen coating + polythene sheet + soil (clay) + tasso tile)
Network for termite proofing will be provided for permanent injection.
AS PER INTERNATIONAL ENGINEERING STANDARDS

Extra Works Detail

Boundary wall (front, sides, back)
Passages flooring (front, sides, back)
Gate columns, Ramp
R.C.C Overhead Water Tank
OUR PROJECT

CONSTRUCTION

Construction Workers

+

Completed Projects

+

Under Process Project

+

Branches in Pakistan

+
We are your trusted manufacturing & engineering partner

We have a professional team of construction workers and auditors for your company

Our extensive resume is comprised of over 3,500 projects completed

Our diverse project list includes engineering buildings and manufacturing structures

Reach us on WhatsApp
1